STO3-5: Santos QNT Pty Ltd McArthur Basin Hydraulic Fracturing Program NT Exploration Permit (EP) 161 EMP

Overview

On 8 June 2021 Santos QNT Pty Ltd (Santos) submitted a revised Environment Management Plan (EMP) for assessment under the Petroleum (Environment) Regulations 2016.

Closes 7 July 2021

Opened 9 June 2021

The revised EMP proposes to do hydraulic fracture stimulation and flow-back and appraisal testing of five wells on two multi-well pads (Inacumba and Tanumbirini). EP161 is in the McArthur Basin, located approximately 350 km south-east of Katherine, NT.

Contact 08 8924 4218

The revision to the EMP focuses on:

  • Fracture stimulation preparation activities   including cement bond logging, drifting and pressure testing;
  • Fracture stimulation and evaluation;
  • Pressure monitoring;
  • Placement of chemical tracers;
  • Installation of tiltmeters;
  • Installation of passive seismic monitoring   surface array;
  • Walkaway vertical seismic profiling;
  • Microseismic / passive seismic monitoring;
  • Tiltmeter recovery and restoration;
  • Flowback fluid recovery and well testing;
  • Installing appraisal (production) testing   tubing;
  • Suspension and build-up testing; and
  • Well appraisal testing.

Read the EMP and Appendices:

For alternative access to the EMP contact the Department of Environment, Parks and Water Security on (08) 8924 4218.

All comments received will be published.

Give us your views

Submit comments on this EMP by doing one of the following:

  • completing this form
  • sending an email to santos.ep161@nt.gov.au
  • mail our comments to:
    • DENR Petroleum Operations unit
      PO Box 3675
      Darwin NT 0801

Last updated: 09 June 2021

Give feedback about this page.

Share this page:

URL copied!