Flowback fluid monitoring results
For hydraulic fracturing, the interest holder must put in place a flowback fluid monitoring program. The monitoring program must meet the requirements of the Code.
The following are public reports from flowback fluid monitoring programs, conducted by interest holders in compliance with the Code in the Beetaloo Sub-Basin.
Flowback fluid monitoring reports
Report name | Description | Relevant approved EMP |
---|---|---|
Shenandoah S1 Flowback Report PDF (312.1 KB) | The report is about flowback fluid from hydraulic fracturing related to Shenandoah South 1 Horizontal well (Shenandoah S 1H) wells submitted as:
| Tamboran B2 Pty Ltd Kyalla 117 N2 Multi well Drilling, Stimulation and Well Testing Program ORI 6-3 PDF (9.6 MB) Approval Date: 22/02/2021 |
Amungee Nw 2H Flowback Report PDF (713.3 KB) Amungee Flowback Risk Assessment PDF (1.4 MB) | This report is about flowback fluid from hydraulic fracturing related to the Amungee NW Work Program on NT Exploration Permit (EP) 98, and is submitted as:
| Tamboran B2 Pty Ltd Origin Energy B2 Pty Ltd - Environmental Management Plan PDF (7.3 MB) Approval Date: 19 May 2022 |
Imperial Carpentaria 2H and 3H Flowback Risk Assessment PDF (6.5 MB) Imperial Carpentaria-3 Reg 37A and Reg 37B Flowback Fluid Report IMP4-3 PDF (1.3 MB) Imperial Carpentaria-2 Reg 37A and Reg 37B Flowback Fluid Report IMP4-3 PDF (992.6 KB) |
Reports are about flowback fluid from hydraulic fracturing related to the Carpentaria 2H and 3H wells, submitted as:
| Imperial Oil and Gas Pty Ltd 2021-2025 EP187 Work Program NT Exploration Permit (EP) 187 PDF (20.0 MB) Approval Date: 17 October 2021 |
Imperial Carp-1 Flowback fluid report PDF (4.2 MB) |
This report is about flowback fluid from hydraulic fracturing related to the Carpentaria-1 Work Program NT Exploration Permit (EP) 187 IMP3-4, and is submitted as:
| Imperial Oil and Gas Pty Ltd 2021 Carpentaria-1 Work Program NT Exploration Permit (EP) 187 IMP3-4 PDF (1.9 MB) Approval Date: 15 February 2021 |
Kyalla 117 N2-1H 6 months Flowback and produced water report PDF (309.7 KB) |
This report is about flowback fluid from hydraulic fracturing related to the Kyalla EP117 N2 drilling hydraulic fracture stimulation and well testing program ORI3, and is submitted as:
| Origin Energy Limited Kyalla drilling hydraulic fracture stimulation and well testing program ORI3 PDF (7.4 MB) Approval Date: 13 August 2019 |
Santos Tanumbirini 2H & 3H PDF (985.7 KB) |
This report about flowback fluid from hydraulic fracturing relates to the McArthur Basin Hydraulic Fracturing Program NT Exploration Permit (EP) 161 (revision) STO3-8, and is submitted as a
| Santos QNT Pty Ltd |
Santos Tanumbirini_1 flowback fluid report PDF (4.4 MB) | This report about flowback fluid from hydraulic fracturing is submitted as a requirement under 37A of the regulations. The report includes measurements of naturally occurring radioactive material (NORM) and the average values are below the ANZECC drinking water guideline values. The wastewater was stored in an enclosed wastewater tank at Tanumbirini exploration wellsite during the wet season in accordance with the approval conditions | Santos QNT Pty Ltd McArthur Basin Hydraulic Fracturing 2019-20 Program Exploration Permit, EP161 Revision 4 PDF (25.3 MB) Approval date: 23/10/2019 |
Santos Tanumbirini_1 wastewater risk assessment report PDF (4.3 MB) | This report provides a risk assessment of the hydraulic fracturing (HF) flowback fluid wastewater from HF operations conducted by Santos on Tanumbirni_1 petroleum exploration well in November 2019 as a Ministerial Condition of Approval under the approved McArthur Basin 2019-2020 Hydraulic Fracturing Program EP161 Environmental Management Plan. The risk assessment report includes: The risk assessment report includes:
The wastewater was stored in an enclosed wastewater tank at Tanumbirini exploration wellsite in accordance with the Approval Conditions. | Santos QNT Pty Ltd McArthur Basin Hydraulic Fracturing 2019-20 Program Exploration Permit, EP161 Revision 4 PDF (25.3 MB) Approval date: 23/10/2019 |
Amungee HF report PDF (504.8 KB) | This report discusses the water quality monitoring program at Amungee NW 1-H exploration well from 2015 to 2018. The data includes water quality from two sources:
The data in this report is useful to compare 2015 baseline monitoring bore data with subsequent years following hydraulic fracturing activities. The data indicates there are no significant changes in groundwater quality to date. | Origin Energy Resources Ltd |
Shenandoah HF water quality monitoring data PDF (769.6 KB) | The report discusses the 2011 water quality monitoring results from the Shenandoah-1 Petroleum Well. The data includes water quality from two sources:
Further monitoring will be undertaken at this bore. | No current EMP |
Give feedback about this page.
Share this page:
URL copied!