Recordable incident reports
The following is a summary of recordable incidents received under section 35 of the Petroleum (Environment) Regulations 2016 for a quarterly reporting period.
2024 Quarter 3: July to September 2024
Recordable incident reports received this quarter:
- BR Simpson Pty Ltd - Simpson Desert Seismic - Recordable Incident Report. PDF (696.2 KB)
- Imperial Oil and Gas Pty Ltd - 2024 Q3 - 2D Seismic Work Program EP187 (IMP1-3) PDF (710.2 KB)
- Imperial Oil and Gas Pty Ltd - 2024 Q3 - 2021 Carpentaria 1 Work Program EP187 (IMP3-4.1) PDF (202.0 KB)
- Imperial Oil and Gas Pty Ltd - 2024 Q3 - 2020-21 Drilling Program NT EP187 (IMP2-6.1) PDF (222.3 KB)
- Imperial Oil and Gas Pty Ltd - 2024 Q3 - 2021-2025 Work Program EP187 (IMP4-3) PDF (202.1 KB)
- Central Petroleum Limited - Dingo and Surprise Field CTP2-2 PDF (314.5 KB)
- Central Petroleum Limited - Mereenie Development Wells WM29 WM30 CTP7-5 PDF (315.1 KB)
- Frontier Oil and Gas - Zevon Test Line EP115 PDF (314.4 KB)
- Central Petroleum Limited - Palm Valley Gas Field PDF (314.4 KB)
- Central Petroleum Limited - NT Drilling Campaign CTP3-4 PDF (303.7 KB)
- Central Petroleum Limited - Mereenie Field CTP6-4 PDF (297.7 KB)
- Santos QNT Pty Ltd - 2D Seismic and Ground Gravity Survey Program (STO7-4) PDF (1.3 MB)
- Santos QNT Pty Ltd - Southern Amadeus 2D Seismic Q3 2024 Incident Report (STO2017) PDF (1.2 MB)
- Santos QNT Pty Ltd - Amadeus Basin Jacko Bore 1DW1 Drill and Test Program (STO5-5) PDF (1.3 MB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well (E2018-0022-0027) PDF (1.3 MB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program (STO1-4) PDF (1.3 MB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program (STO2-7) PDF (1.3 MB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic fracturing Program Incident Report (STO3-8) PDF (1.3 MB)
- Sweetpea Petroleum Pty Ltd - 2D Seismic (SWP1-4) PDF (797.3 KB)
- Sweetpea Petroleum Pty Ltd - Civils & GW bores (SWP2-2) PDF (815.4 KB)
- Sweetpea Petroleum Pty Ltd - Drill and Stimulation (SWP4-3) PDF (798.3 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation(ORI11-3) PDF (806.3 KB)
- Tamboran B2 Pty Ltd - Amungee EPT (ORI7-2) PDF (806.6 KB)
- Tamboran B2 Pty Ltd - Beetaloo multi-well (ORI10-3) PDF (1.8 MB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 (ORI8-2) PDF (800.5 KB)
- Tamboran B2 Pty Ltd - Shenandoah South E&A (TAM1-3) PDF (865.2 KB)
- Tamboran B2 Pty Ltd - Velkerri Civils (ORI4-1) PDF (800.5 KB)
- Tamboran B2 Pty Ltd - Velkerri D&S (ORI5-4) PDF (799.6 KB)
- Tamboran B2 Pty Ltd -Kalala S (ORI9-2) PDF (800.3 KB)
2024 Quarter 2: April to June 2024
Recordable incident reports received this quarter:
- Central Petroleum Limited - Mereenie Field CTP6-4 PDF (327.4 KB)
- Central Petroleum Limited - Central - Mereenie Development Wells WM29WM30 EMP CTP7-5 PDF (345.2 KB)
- Central Petroleum Limited - Dingo & Surprise Field CTP2-2 PDF (345.1 KB)
- Central Petroleum Limited - NT Drilling Campaign CTP3-4 PDF (335.4 KB)
- Central Petroleum Limited - Palm Valley Gas Field PDF (357.4 KB)
- Frontier Oil and Gas - Zevon Test Line EP115 PDF (325.0 KB)
- BR Simpson Pty Ltd - Simpson Desert Seismic BRS1-5 PDF (413.6 KB)
- Sweetpea Petroleum Pty Ltd - 2D Civils & GW bores (SWP2-2) PDF (811.6 KB)
- Sweetpea Petroleum Pty Ltd - 2D seismic (SWP1-4) PDF (804.7 KB)
- Sweetpea Petroleum Pty Ltd - Drill and stimulation (SWP4-3) PDF (803.2 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation (ORI11-3) PDF (805.5 KB)
- Tamboran B2 Pty Ltd - Amungee EPT (ORI7-2) PDF (805.8 KB)
- Tamboran B2 Pty Ltd - Beetaloo multi-well EP 98 & 76 (ORI10-3) PDF (2.9 MB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 (ORI8-2) PDF (806.2 KB)
- Tamboran B2 Pty Ltd - Kalala S (ORI9-2) V1 PDF (805.8 KB)
- Tamboran B2 Pty Ltd - Shenandoah South E&A (TAM1-3) PDF (2.9 MB)
- Tamboran B2 Pty Ltd - Velkerri Civils (ORI4-1) PDF (805.9 KB)
- Tamboran B2 Pty Ltd - Velkerri D&S (ORI5-4) PDF (805.1 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well (E2018-0022-0027) PDF (369.0 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program (STO1-4) PDF (359.0 KB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program (STO2-7) PDF (358.4 KB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic Fracturing Program (STO3-8.1) PDF (340.8 KB)
- Santos QNT Pty Ltd - Southern Amadeus 2D Seismic (STO-2017) PDF (362.9 KB)
- Imperial Oil and Gas Pty Ltd - 2D Seismic Work Program EP187 (IMP1-3) PDF (715.5 KB)
- Imperial Oil and Gas Pty Ltd - 2020-21 Drilling Program NT EP187 (IMP2-6) PDF (717.7 KB)
- Imperial Oil and Gas Pty Ltd - 2021 Carpentaria 1 Work Program EP187 (IMP3-4)-1 PDF (715.5 KB)
- Imperial Oil and Gas Pty Ltd - 2021-2025 Work Program EP187 (IMP4-3) PDF (716.1 KB)
2024 Quarter 1: January to March 2024
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd - Dukas 1 Gas Well (STO-2019) PDF (791.0 KB)
- Santos QNT Pty Ltd - Southern Amadeus 2D Seismic (STO-2017) PDF (818.4 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program (STO1-4) PDF (912.7 KB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program (STO2-7) PDF (1.0 MB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic Fracturing Program (STO3-8) PDF (971.1 KB)
- Imperial Oil and Gas Pty Ltd - 2D Seismic Work Program EP187 (IMP1-3) PDF (475.6 KB)
- Imperial Oil and Gas Pty Ltd - 2020-21 Drilling Program NT EP187 (IMP2-6) PDF (188.4 KB)
- Imperial Oil and Gas Pty Ltd - 2021 Carpentaria 1 Work Program EP187 (IMP3-4)-1 PDF (483.7 KB)
- Imperial Oil and Gas Pty Ltd - 2021-2025 Work Program EP187 (IMP4-3) PDF (406.2 KB)
- Central Petroleum Limited - MRN Workover CTP4-3 PDF (286.0 KB)
- Central Petroleum Limited - Mereenie Field CTP6-4 PDF (268.2 KB)
- Central Petroleum Limited - Central - Mereenie Development Wells WM29WM30 EMP CTP7-5 PDF (290.1 KB)
- Central Petroleum Limited - Dingo & Surprise Field CTP2-2 PDF (286.3 KB)
- Central Petroleum Limited - NT Drilling Campaign CTP3-4 PDF (276.7 KB)
- Central Petroleum Limited - Palm Valley Gas Field PDF (334.5 KB)
- Frontier Oil and Gas - Zevon Test Line EP115 PDF (334.2 KB)
- Sweetpea Petroleum Pty Ltd - 2D seismic (SWP1-4) PDF (295.5 KB)
- Sweetpea Petroleum Pty Ltd - civils & water bore (SWP2-2) PDF (295.6 KB)
- Sweetpea Petroleum Pty Ltd - D&S (SWP4-3) PDF (295.6 KB)
- Tamboran B2 Pty Ltd - Kalala S (ORI9-2) PDF (296.3 KB)
- Tamboran B2 Pty Ltd - Kyalla DS (ORI3-2) PDF (296.0 KB)
- Tamboran B2 Pty Ltd - Kyalla multi-well (ORI6-3) PDF (296.3 KB)
- Tamboran B2 Pty Ltd - Velkerri D&S (ORI5-4) PDF (296.0 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation (ORI11-3) PDF (295.9 KB)
- Tamboran B2 Pty Ltd - Amungee NW EPT (ORI7-2) PDF (296.2 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring Velkerri (ORI2-1) PDF (296.2 KB)
- Tamboran B2 Pty Ltd - Beetaloo multi-well EP 98 & 76 (ORI10-3) PDF (296.2 KB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 (ORI8-2) PDF (297.8 KB)
- Tamboran B2 Pty Ltd - Kyalla civils (ORI1-2) PDF (296.0 KB)
- Tamboran B2 Pty Ltd - Velkerri civils (ORI4-1) PDF (296.3 KB)
2023 Quarter 4: October to December 2023
Recordable incident reports received this quarter:
- Imperial Oil and Gas Pty Ltd - 2020-21 Drilling Program NT EP187 (IMP2-6) PDF (184.4 KB)
- Imperial Oil and Gas Pty Ltd - 2021 Carpentaria 1 Work Program EP187 (IMP3-4)-1 PDF (184.1 KB)
- Imperial Oil and Gas Pty Ltd - 2021-2025 Work Program EP187 (IMP4-3) PDF (183.9 KB)
- Imperial Oil and Gas Pty Ltd - 2D Seismic Work Program EP187 (IMP1-3)-2 PDF (183.7 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (192.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (168.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (176.7 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (203.1 KB)
- Central Petroleum Limited - Palm Valley Gas Field PDF (211.3 KB)
- Frontier Oil and Gas - Zevon Test Line PDF (201.2 KB)
- Sweetpea Petroleum Pty Ltd - D&S PDF (118.4 KB)
- Sweetpea Petroleum Pty Ltd - 2D seismic (SWP1-4) PDF (118.0 KB)
- Sweetpea Petroleum Pty Ltd - civils and water bore PDF (118.5 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation PDF (143.2 KB)
- Tamboran B2 Pty Ltd - Amungee NW EPT PDF (128.3 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring EP 98 PDF (128.0 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring EP 117 PDF (129.7 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring Velkerri PDF (128.6 KB)
- Tamboran B2 Pty Ltd - Beetaloo multi-well EP 98 & 76 PDF (203.8 KB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 PDF (142.7 KB)
- Tamboran B2 Pty Ltd - Kalala S PDF (129.2 KB)
- Tamboran B2 Pty Ltd - Kyalla civils PDF (127.8 KB)
- Tamboran B2 Pty Ltd - Kyalla DS PDF (146.7 KB)
- Tamboran B2 Pty Ltd - Kyalla multi-well PDF (129.0 KB)
- Tamboran B2 Pty Ltd - Velkerri civils PDF (128.2 KB)
- Tamboran B2 Pty Ltd - Velkerri D&S PDF (133.8 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well incident report PDF (119.7 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program incident report PDF (119.3 KB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program incident report PDF (117.3 KB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic Fracturing Program PDF (128.8 KB)
- Santos QNT Pty Ltd - Southern Amadeus 2D Seismic incident report PDF (116.0 KB)
2023 Quarter 3: July to September 2023
Recordable incident reports received this quarter:
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (195.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field – Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (154.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (174.9 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (206.8 KB)
- Central Petroleum Limited - Palm Valley Gas Field PDF (215.5 KB)
- Imperial Oil and Gas Pty Ltd - 2D Seismic Work Program EP187 (IMP1-3)-2 PDF (134.7 KB)
- Imperial Oil and Gas Pty Ltd - 2021 Carpentaria 1 Work Program EP187 (IMP3-4)-2 PDF (196.5 KB)
- Imperial Oil and Gas Pty Ltd - 2020-21 Drilling Program NT EP187 (IMP2-6) PDF (134.9 KB)
- Imperial Oil and Gas Pty Ltd - 2021-2025 Work Program EP187 (IMP4-3)-2 PDF (139.1 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (448.3 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program (STO1-4) PDF (270.4 KB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program (STO2-7) PDF (267.3 KB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic Fracturing Program PDF (275.5 KB)
- Santos QNT Pty Ltd - South Amadeus 2D Seismic Monitoring Program PDF (263.1 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (118.4 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (157.0 KB)
- Sweetpea Petroleum Pty Ltd - 2D seismic (SWP1-4) PDF (143.3 KB)
- Sweetpea Petroleum Pty Ltd - civils & water bore (SWP2-2) PDF (147.4 KB)
- Sweetpea Petroleum Pty Ltd - D&S (SWP4-3) PDF (146.2 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation (ORI11-3) PDF (155.0 KB)
- Tamboran B2 Pty Ltd - Amungee NW EPT (ORI7-2) PDF (132.2 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring EP 98 PDF (132.6 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring EP 117 PDF (132.5 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW monitoring Velkerri (ORI2-1) PDF (135.4 KB)
- Tamboran B2 Pty Ltd - Beetaloo multi-well EP 98 & 76 (ORI10-3) PDF (135.1 KB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 (ORI8-2) PDF (153.2 KB)
- Tamboran B2 Pty Ltd - Kalala S (ORI9-2) PDF (135.5 KB)
- Tamboran B2 Pty Ltd - Kyalla civils (ORI1-2) PDF (132.5 KB)
- Tamboran B2 Pty Ltd - Kyalla DS (ORI3-2) PDF (143.7 KB)
- Tamboran B2 Pty Ltd - Kyalla multi-well (ORI6-3) PDF (200.6 KB)
- Tamboran B2 Pty Ltd - Velkerri civils (ORI4-1) PDF (132.5 KB)
- Tamboran B2 Pty Ltd - Velkerri D&S (ORI5-4) PDF (132.0 KB)
2023 Quarter 2: April to June 2023
Recordable incident reports received this quarter:
- Imperial Oil and Gas Pty Ltd - 2D Seismic Work Program EP187 (IMP1-3) PDF (198.2 KB)
- Imperial Oil and Gas Pty Ltd - 2020-21 Drilling Program NT EP187 (IMP2-6.1) PDF (118.1 KB)
- Imperial Oil and Gas Pty Ltd - 2021 Carpentaria 1 Work Program EP187 (IMP3-4) PDF (156.2 KB)
- Imperial Oil and Gas Pty Ltd - 2021-2025 Work Program EP187 (IMP4-3) PDF (176.8 KB)
- Peak Helium Pty Ltd - EP134 Work Program (PKH2-3) PDF (119.3 KB)
- Peak Helium Pty Ltd - Seismic (PKH1-6) PDF (155.0 KB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic Fracturing Program (STO3-8.1) PDF (134.1 KB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program (STO2-7) PDF (82.7 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (99.0 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program (STO1-4) PDF (83.9 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (74.2 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (159.3 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (205.2 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field – Workover and Wellhead, Equipment, Safety System and Gathering Line Activitiees PDF (251.0 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (213.5 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (243.1 KB)
- Central Petroleum Limited - Palm Valley Gas Field PDF (255.2 KB)
- Sweetpea Petroleum Pty Ltd 2D Seismic (SWP1-4) PDF (114.2 KB)
- Sweetpea Petroleum Pty Ltd - Civils and Waterbore (SWP2-2) PDF (114.8 KB)
- Sweetpea Petroleum Pty Ltd - Drilling HF Stimulation and Well testing (SWP4-3) PDF (114.7 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW Monitoring EP98 PDF (124.0 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW Monitoring EP117 PDF (124.1 KB)
- Tamboran B2 Pty Ltd - Kyalla Civils (ORI1-1) PDF (124.0 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW Monitoring Velkerri - ORI2-1 PDF (124.7 KB)
- Tamboran B2 Pty Ltd - Kyalla 117 Drilling and HF Stimulation - ORI3-2 PDF (172.2 KB)
- Tamboran B2 Pty Ltd - Velkerri Civils - ORI4-1 PDF (124.3 KB)
- Tamboran B2 Pty Ltd - Velkerri Drilling and HF Stimulation - ORI5-4 PDF (125.0 KB)
- Tamboran B2 Pty Ltd - Kyalla Multiwell - ORI6-3 PDF (125.3 KB)
- Tamboran B2 Pty Ltd - Amungee NW - ORI7-2 PDF (124.4 KB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 - ORI8-2 PDF (139.0 KB)
- Tamboran B2 Pty Ltd - Kalala S1 - ORI9-2 PDF (125.2 KB)
- Tamboran B2 Pty Ltd - Beetaloo Multiwell EP98 and EP76 - ORI10-3 PDF (154.6 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation - ORI11-3 PDF (139.4 KB)
2023 Quarter 1: January to March 2023
Recordable incident reports received this quarter:
- Imperial Oil and Gas Pty Ltd - 2D Seismic Work Program EP187 (IMP1-3) PDF (141.7 KB)
- Imperial Oil and Gas Pty Ltd - 2020-21 Drilling Program NT EP187 (IMP2-6.1) PDF (366.4 KB)
- Imperial Oil and Gas Pty Ltd - 2021-2025 EP187 Work Program EP187 (IMP4-3) PDF (476.0 KB)
- Imperial Oil and Gas Pty Ltd - 2021 Carpentaria 1 Work Program EP187 (IMP3-4) PDF (185.4 KB)
- Peak Helium - Seismic Q1 2023 PDF (117.9 KB)
- Central Petroleum Limited – Dingo Gas Field and Surprise Oil Field PDF (215.1 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (215.6 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (216.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (216.0 KB)
- Central Petroleum Limited - NT Drilling PDF (253.1 KB)
- Central Petroleum Limited - Palm Valley Field PDF (278.5 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (127.4 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Civils and Seismic Program (STO1-4) PDF (126.7 KB)
- Santos QNT Pty Ltd - McArthur Basin Drilling Program (STO2-7) PDF (207.1 KB)
- Santos QNT Pty Ltd - McArthur Basin Hydraulic Fracturing Program (STO3-8.1) PDF (128.1 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (126.9 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (129.4 KB)
- Sweetpea Petroleum Pty Ltd - 2D Seismic - SWP1-4 PDF (119.7 KB)
- Sweetpea Petroleum Pty Ltd - Civils and Waterbore - SWP2-2 PDF (120.3 KB)
- Sweetpea Petroleum Pty Ltd - Drilling HF Stimulation and Well Testing - SWP4-3 PDF (120.2 KB)
- Tamboran B2 Pty Ltd - Amungee Delineation - ORI11-3 PDF (144.9 KB)
- Tamboran B2 Pty Ltd - Amungee NW - ORI7-2 PDF (129.9 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW Monitoring EP98 PDF (129.5 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW Monitoring EP117 PDF (129.6 KB)
- Tamboran B2 Pty Ltd - Beetaloo GW Monitoring Velkerri - ORI2-1 PDF (130.2 KB)
- Tamboran B2 Pty Ltd - Beetaloo Multiwell EP98 and EP76 - ORI10-3 PDF (145.4 KB)
- Tamboran B2 Pty Ltd - Beetaloo W-1 - ORI8-2 PDF (144.4 KB)
- Tamboran B2 Pty Ltd - Kalala S1 - ORI9-2 PDF (132.2 KB)
- Tamboran B2 Pty Ltd - Kyalla 117 Drilling and HF Stimulation - ORI3-2 PDF (130.2 KB)
- Tamboran B2 Pty Ltd - Kyalla Civils - ORI1-1 PDF (129.5 KB)
- Tamboran B2 Pty Ltd - Kyalla Multiwell - ORI6-3 PDF (130.8 KB)
- Tamboran B2 Pty Ltd - Velkerri Civils - ORI4-1 PDF (129.8 KB)
- Tamboran B2 Pty Ltd - Velkerri Drilling and HF Stimulation - ORI5-4 PDF (130.6 KB)
2022 Quarter 4: October to December 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (116.6 KB)
- Imperial Oil and Gas - Seismic IMP1 PDF (362.7 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (364.9 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (361.4 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing IMP4 PDF (410.2 KB)
- Tamboran - Amungee Delineation - ORI11-3 PDF (69.0 KB)
- Tamboran - Amungee Multiwell - ORI10 PDF (69.9 KB)
- Tamboran - Amungee NW - ORI7-2 PDF (69.9 KB)
- Tamboran - Beetaloo EMP ORI8-2 PDF (70.0 KB)
- Tamboran - Kalala S1 Maintenance and Monitoring - ORI9-2 PDF (68.8 KB)
- Tamboran - Kyalla 117 Drilling and Stimulation - ORI3-2 PDF (70.2 KB)
- Tamboran - Kyalla 117 N2 civils - ORI1-1 PDF (69.6 KB)
- Tamboran - Kyalla 117 Water Bore - ORI-2019 PDF (70.3 KB)
- Tamboran - Kyalla multiwell - ORI6-3 PDF (70.8 KB)
- Tamboran - Velk 76 S2 civil - ORI4-1 PDF (70.2 KB)
- Tamboran - Velkerri 76 S2 Drilling, HF and well testing - ORI5-4 PDF (70.8 KB)
- Tamboran - Velkerri 76 S2 Water bore - ORI2-1 PDF (70.9 KB)
- Tamboran - Velkerri 98 N1 water bore PDF (70.3 KB)
- Sweatpea Petroleum Limited - Civils and waterbore - SWP2-3 PDF (70.2 KB)
- Sweatpea Petroleum Limited - Seismic - SWP1-4 PDF (69.9 KB)
- Sweatpea Petroleum Limited - Well Drilling, Hydraulic Fracture Stimulation and Well Testing - SWP4-3 PDF (94.4 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (124.4 KB)
- Santos QNT Pty Ltd – Tanumbirini North Water Bore Monitoring Program PDF (142.1 KB)
- Santos QNT Pty Ltd – Water Bore Monitoring Program PDF (140.4 KB)
- Santos QNT Pty Ltd – 2019 Civil and Seismic Program) PDF (106.4 KB)
- Santos QNT Pty Ltd – 2019-20 McArthur Hydraulic Fracturing Program STO3-8 PDF (107.6 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019 Drilling Program STO2-7 PDF (201.8 KB)
- Central Petroleum Limited – Dingo Gas Field and Surprise Oil Field PDF (219.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (216.5 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (109.9 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (215.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (114.7 KB)
- Central Petroleum Limited - NT Drilling PDF (252.8 KB)
2022 Quarter 3: July to September 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (117.5 KB)
- Origin – Amungee NW ORI7 PDF (44.2 KB)
- Origin – Amungee multiwell ORI10 PDF (44.2 KB)
- Origin – Kalala S1 ORI9 PDF (42.8 KB)
- Origin – Kyalla Multiwell ORI6 PDF (45.1 KB)
- Origin – Kyalla Water Bore EMP PDF (44.3 KB)
- Origin – Kyalla N2 Civils Construction ORI1 PDF (43.5 KB)
- Origin – Kyalla N2 Drilling, Stimulation and Well Testing ORI3 PDF (44.2 KB)
- Origin – Velkerri 98 N1 Water Bore PDF (44.9 KB)
- Origin – Velkerri 76 S2 Drilling, Stimulation and Well Testing ORI5 PDF (44.7 KB)
- Origin – Velkerri 76 S2 Water Bore - ORI2 PDF (44.5 KB)
- Origin – Velkerri 76 S2 Civil Construction ORI4 PDF (44.2 KB)
- Imperial Oil and Gas – Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (432.6 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (239.3 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (239.7 KB)
- Imperial Oil and Gas – Seismic IMP001-03 PDF (238.8 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (176.6 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (147.5 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (122.2 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program STO1-4 PDF (122.3 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program STO3-8 PDF (121.8 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program STO2-7 PDF (199 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (70.5 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (72.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (71.9 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (71.0 KB)
- Central Petroleum Limited - Palm Valley Field PDF (107.0 KB)
- Central Petroleum Limited - NT Drilling PDF (260.7 KB)
- Sweetpea Petroleum Limited - Civil Construction and Water Bore Drilling PDF (151.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (161.4 KB)
- Sweetpea Petroleum Limited - Well Drilling, Hydraulic Fracture Stimulation and Well Testing PDF (188.5 KB)
2022 Quarter 2: April to June 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (115.8 KB)
- Central Petroleum Limited - NT Drilling PDF (101.3 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (95.3 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (95.5 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (102.6 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (99.5 KB)
- Central Petroleum Limited - Palm Valley Field PDF (105.2 KB)
- Imperial Oil and Gas – Drilling IMP2 PDF (374.4 KB)
- Imperial Oil and Gas – Hydraulic Fracturing IMP3 PDF (374.0 KB)
- Imperial Oil and Gas – Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (376.5 KB)
- Imperial Oil and Gas – Seismic PDF (374.8 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (203.2 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (208.2 KB)
- Santos QNT Pty Ltd - 2019 Civil & Seismic Program PDF (131.5 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (172.3 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (134.6 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (162.6 KB)
- Origin – Amungee Multiwell ORI PDF (73.9 KB)
- Origin – Amungee NW-1H ORI7 PDF (73.9 KB)
- Origin – Beetaloo W-1 ORI8 PDF (74.0 KB)
- Origin – Kalala S1 ORI9 PDF (72.7 KB)
- Origin – Kyalla N2 Drilling, Stimulation and Well Test ORI3 PDF (73.8 KB)
- Origin – Kyalla Multiwell ORI6 PDF (74.7 KB)
- Origin – Kyalla N2 Civil Construction ORI1 PDF (73.2 KB)
- Origin – Kyalla Water Bore EMP PDF (73.9 KB)
- Origin – Velkerri 76 S2 Civil Construction ORI4 PDF (73.8 KB)
- Origin – Velkerri 76 S2 Drilling, Stimulation and Well Testing - ORI5 PDF (74.4 KB)
- Origin – Velkerri 76 S2 Water Bore - ORI2 PDF (74.5 KB)
- Origin – Velkerri 98 N1 Water Bore PDF (74.2 KB)
- Sweetpea Petroleum Limited - Civil Construction and Water Bore Drilling PDF (212.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.6 KB)
2022 Quarter 1: January to March 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (115.7 KB)
- Origin - Amungee NW-1H EP98 - ORI7 PDF (63.5 KB)
- Origin - Beetaloo W-1 EMP - ORI8 PDF (65.5 KB)
- Origin - Kyalla 117 N2 Civil Construction - ORI1 PDF (63.1 KB)
- Origin - Kyalla 117 N2 Drilling, Stimulation and Well Test - ORI3 PDF (63.7 KB)
- Origin - Kyalla 117 Water Bore PDF (63.8 KB)
- Origin - Kyalla Multiwell - ORI6 PDF (66.3 KB)
- Origin - Velkerri 76 S2 Civil Construction - ORI4 PDF (63.7 KB)
- Origin - Velkerri 76 S2 Drilling, Stimulation and Well Testing - ORI5 PDF (64.3 KB)
- Origin - Velkerri 76 S2 Water Bore - ORI2 PDF (64.4 KB)
- Origin - Velkerri 98 N1 Water Bore PDF (63.7 KB)
- Origin - Kalala S Maintenance and Monitoring EMP EP98 - ORI9 PDF (64.2 KB)
- Central Petroleum Limited - NT Drilling PDF (95.4 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (95.7 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (90.9 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (106.5 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (99.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (101.5 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (365.5 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (363.2 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (655.3 KB)
- Imperial Oil and Gas - Seismic PDF (362.7 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (198.3 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (198.1 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program PDF (102.3 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (136.1 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (102.0 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (122.2 KB)
- Sweetpea Petroleum Limited - Civil Construction and Water Bore Drilling PDF (151.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.3 KB).
2021 Quarter 4: October to December 2021
Recordable incident reports received this quarter:
- Central Petroleum Limited - Northern Territory Drilling PDF (95.4 KB)
- Central Petroleum Limited - Dingo and Surprise Oil Field PDF (95.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed well sites WM25 and WM26 PDF (95.9 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (108.4 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, equipment, safety system and gathering line activities PDF (100.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (108.4 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (363.4 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (362.2 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (364.0 KB)
- Imperial Oil and Gas - Seismic PDF (361.1 KB)
- Origin - Amungee NW-1H EP98 PDF (59.4 KB)
- Origin Beetaloo W-1 EMP PDF (59.6 KB)
- Origin - Kyalla 117 N2 civil construction PDF (59.1 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (59.7 KB)
- Origin - Kyalla 117 Water bore PDF (59.8 KB)
- Origin - Kyalla multiwell PDF (60.3 KB)
- Origin - Velkerri 76 S2 civil construction PDF (59.7 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (60.2 KB)
- Origin - Velkerri 76 S2 Water bore PDF (60.3 KB)
- Origin - Velkerri 98 N1 water bore PDF (59.6 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (515.7 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (444.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (525.4 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program PDF (271.0 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (522.4 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (131.2 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.3 KB).
2021 Quarter 3: July to September 2021
Recordable incident reports received this quarter:
- Central Petroleum Limited - Northern Territory Drilling PDF (59.9 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (80.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (82.2 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (184.4 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (81.9 KB)
- Central Petroleum Limited - Palm Valley PDF (128.2 KB)
- Imperial Oil and Gas – Hydraulic Fracturing IMP3 PDF (361.6 KB)
- Imperial Oil and Gas – Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (363.8 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (409.3 KB)
- Imperial Oil and Gas - Seismic PDF (361.0 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (137.4 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (121.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (148.9 KB)
- Santos QNT Pty Ltd - 2019 Civils and Seismic Program PDF (103.5 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (102.8 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (132.9 KB)
- Origin - Amungee NW-1H EP98 PDF (60.3 KB)
- Origin - Kyalla 117 N2 civil construction PDF (62.2 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (62.4 KB)
- Origin - Kyalla 117 Water bore PDF (62.5 KB)
- Origin - Kyalla multiwell PDF (63.0 KB)
- Origin - Velkerri 76 S2 civil construction PDF (61.8 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (62.3 KB)
- Origin - Velkerri 76 S2 Water bore PDF (62.5 KB)
- Origin - Velkerri 98 N1 water bore PDF (63.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.4 KB).
2021 Quarter 2: April to June 2021
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (104.4 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (117.5 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (128.5 KB)
- Santos QNT Pty Ltd - 2019 Civils and Seismic Program PDF (99.6 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (99.2 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (132.9 KB)
- Imperial Oil and Gas - Drilling PDF (129.6 KB)
- Imperial Oil and Gas - Hydraulic Fracturing PDF (129.3 KB)
- Imperial Oil and Gas - Seismic PDF (130.0 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (78.6 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (80.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (181.2 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (80.6 KB)
- Central Petroleum Limited - Palm Valley PDF (78.5 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (79.7 KB)
- Origin - Kyalla 117 N2 civil construction PDF (63.8 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (81.8 KB)
- Origin - Kyalla 117 Water bore PDF (64.0 KB)
- Origin - Kyalla multiwell PDF (64.6 KB)
- Origin - Velkerri 76 S2 civil construction PDF (63.4 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (63.9 KB)
- Origin - Velkerri 76 S2 Water bore PDF (64.0 KB)
- Origin - Velkerri 98 N1 water bore PDF (65.2 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.6 KB).
2021 Quarter 1: January to March 2021
Recordable incident reports received this quarter:
- Origin - Velkerri 98 N1 water bore PDF (60.8 KB)
- Origin - Kyalla 117 N2 civil construction PDF (59.3 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (59.6 KB)
- Origin - Kyalla 117 N2 Water bore PDF (59.6 KB)
- Origin - Kyalla multiwell PDF (60.1 KB)
- Origin - Velkerri 76 S2 civil construction PDF (59.4 KB)
- Origin - Velkerri 76 S2 Drilling Stimulation and Well Testing PDF (60.1 KB)
- Origin - Velkerri 76 S2 Water bore PDF (60.1 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (81.3 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (108.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (225.1 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (79.3 KB)
- Central Petroleum Limited - Palm Valley PDF (223.2 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (81.9 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Seismic PDF (132.0 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Seismic Supplementary PDF (131.9 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Drilling Program PDF (213.4 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Drilling Program Supplimentary PDF (164.2 KB)
- Central Petroleum Limited - Mereenie Gas Field PDF (182.2 KB)
- Origin - Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (118.0 KB)
- Santos QNT Pty Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (87.7 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program Velkerri 76 EP76 PDF (66.1 KB)
- Origin - Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (66.0 KB)
- Santos QNT Pty Ltd - McArthur Basin Civil and Seismic program PDF (86.5 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (64.2 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (145.6 KB)
- Central Petroleum Limited - Palm Valley gas field PDF (237.5 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program Environmental Management Plan PDF (91.1 KB)
- Origin- Beetaloo Basin Kyalla, Civil Construction EP117 N2 PDF (63.9 KB)
- Origin - Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (64.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.3 KB).
2020 Quarter 4: October to December 2020
Recordable incident reports received this quarter:
- MRN Workovers - Quarterly Recordable Incident Summary PDF (83.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019-20 Hydraulic Fracturing PDF (88.8 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (91.8 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (75.8 KB)
- Central Petroleum Limited - Mereenie Gas Field PDF (243.4 KB)
- Santos QNT PTY Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (89.9 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (88.3 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (66.6 KB)
- Origin - Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (61.8 KB)
- Origin - Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (66.5 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program Velkerri 76 EP76 PDF (62.5 KB)
- Origin - Groundwater Monitoring Bores - Velkerri EP98 PDF (71.2 KB)
- Origin- Beetaloo Basin Kyalla, Civil Construction EP117 N2 PDF (66.2 KB)
- Origin - Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (66.5 KB)
- Imperial Oil and Gas - EP187 2020-21 Drilling Program PDF (174.4 KB)
- Imperial Oil and Gas - 2019 Civils and Seismic program - EP187 PDF (144.9 KB)
- Central Petroleum Limited – Palm Valley Gas Field PDF (219.1 KB)
- Santos QNT Pty Ltd – Tanumbirini Water Bore Monitoring Program PDF (90.5 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (118.7 KB)
- Sweetpea Petroleum Limited - Seismic PDF (156.1 KB).
2020 Quarter 3: July to September 2020
Recordable incident reports received this quarter:
- Imperial Oil and Gas- EP187 2020-21 Drilling program PDF (320.1 KB)
- Imperial Oil and Gas – 2019 Civils and Seismic Program PDF (184.2 KB)
- Santos QNT Pty – McArthur Basin 2019-20 Hydraulic Fracturing PDF (92.9 KB)
- Santos QNT Pty – McArthur Basin 2019 Drilling Program PDF (88.4 KB)
- Central Petroleum Limited – Dingo Gas Field and Surprise Oil Field PDF (181.7 KB)
- Origin – Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (89.3 KB)
- Origin – Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (86.2 KB)
- Origin – Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (88.6 KB)
- Origin – Beetaloo Basin groundwater monitoring bore installation program, Velkerri 76 EP76 PDF (88.9 KB)
- Origin – Beetaloo Basin groundwater monitoring bore installation program, Velkerri EP98 PDF (89.3 KB)
- Origin – Beetaloo Basin Kyalla, Civil ConstructionEP117 N2 PDF (62.2 KB)
- Origin – Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (99.4 KB)
- Central Petroleum Limited – Dingo gas field PDF (80.3 KB)
- Central Petroleum Limited – Mereenie gas field PDF (187.5 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (104.6 KB)
- Central Petroleum Limited – Palm Valley gas field PDF (235.1 KB)
- Dukas 1 Gas Well PDF (118.8 KB)
- Santos QNT Pty Ltd – Tanumbirini Water Bore Monitoring Program PDF (90.3 KB)
- Santos QNT Pty Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (86.1 KB).
2020 Quarter 2: April to June 2020
Recordable incident reports received this quarter:
- Central Petroleum Limited – Surprise oil field PDF (80.3 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019-20 Hydraulic Fracturing PDF (91.2 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019 Drilling Program PDF (88.6 KB)
- Santos QNT Pty – Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (86.1 KB)
- Central Petroleum Limited – Dingo gas field PDF (79.3 KB)
- Central Petroleum Limited – Mereenie gas field PDF (79.2 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (84.3 KB)
- Santos QNT Pty Ltd – Tanumbirini: Water bore monitoring program PDF (86.1 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (114.6 KB)
- Central Petroleum Limited – Palm Valley gas field PDF (219.6 KB).
2020 Quarter 1: January to March 2020
Recordable incident reports received this quarter:
- Central Petroleum Limited - Palm Valley gas field PDF (81.0 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (84.4 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (114.9 KB)
- Central Petroleum Limited – Surprise oil field PDF (80.1 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019-20 Hydraulic Fracturing PDF (84.7 KB)
- Central Petroleum Limited – Dingo oil field PDF (77.3 KB)
- Central Petroleum Limited – Mereenie gas field PDF (152.1 KB)
- Santos – McArthur Basin 2019 Drilling Program PDF (85.3 KB).
2019 Quarter 4: October to December 2019
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd - McArthur Basin 2019-20 Hydraulic Fracturing PDF (88.4 KB)
- Imperial Oil and Gas Pty Ltd – 2D Seismic Work Program EP187 PDF (137.7 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (92.3 KB)
- Santos QNT Pty Ltd – Tanumbirini: water bore monitoring program PDF (85.9 KB)
- Central Petroleum Limited – Dingo oil field PDF (76.2 KB)
- Central Petroleum Limited – Mereenie gas field PDF (128.8 KB)
- Central Petroleum Limited - Palm Valley gas field PDF (81.6 KB)
- Central Petroleum Limited – Surprise Oil Field PDF (77.2 KB)
- Santos – Dukas 1 Gas Well PDF (121.0 KB)
- Santos – McArthur Basin 2019 Drilling Program PDF (85.5 KB).
2019 Quarter 3: July to September 2019
Recordable incident reports received this quarter:
- Central Petroleum Mereenie Pty Ltd – Mereenie Gas Field PDF (77.8 KB)
- Central Petroleum Limited – Dingo Gas Field PDF (77.2 KB)
- Central Petroleum – Palm Valley Gas Field PDF (136.2 KB)
- Santos QNT Pty Ltd – Civil and Seismic program – McArthur Basin EP161 PDF (93.5 KB)
- Santos – bore water monitoring: Tanumbirini North PDF (91.4 KB)
- Santos – McArthur Basin 2019 drilling program PDF (89.5 KB).
2019 Quarter 2: April to June 2019
Recordable incident reports received this quarter:
- Central Petroleum – Mereenie gas field PDF (183.4 KB)
- Central Petroleum – Dingo gas field PDF (77.5 KB)
- Central Petroleum – Palm Valley gas field PDF (173.7 KB)
- Santos – Dukas 1 Conventional gas well PDF (27.2 KB)
- Origin – Kyalla 117 water monitoring bore PDF (141.1 KB)
- Santos – water bore monitoring: Tanumbirini South, Inacumba North and Inacumba South PDF (86.6 KB).
2019 Quarter 1: January to March 2019
Recordable incident reports received this quarter:
2018 Quarter 4: October to December 2018
Recordable incident reports received this quarter:
Give feedback about this page.
Share this page:
URL copied!