Recordable incident reports
The following is a summary of recordable incidents received under section 35 of the Petroleum (Environment) Regulations 2016 for a quarterly reporting period.
2021-22 quarter 3: January to March 2022
Recordable incident reports received this quarter:
- Origin - Amungee NW-1H EP98 - ORI7 PDF (63.5 KB)
- Origin - Beetaloo W-1 EMP - ORI8 PDF (65.5 KB)
- Origin - Kyalla 117 N2 Civil Construction - ORI1 PDF (63.1 KB)
- Origin - Kyalla 117 N2 Drilling, Stimulation and Well Test - ORI3 PDF (63.7 KB)
- Origin - Kyalla 117 Water Bore PDF (63.8 KB)
- Origin - Kyalla Multiwell - ORI6 PDF (66.3 KB)
- Origin - Velkerri 76 S2 Civil Construction - ORI4 PDF (63.7 KB)
- Origin - Velkerri 76 S2 Drilling, Stimulation and Well Testing - ORI5 PDF (64.3 KB)
- Origin - Velkerri 76 S2 Water Bore - ORI2 PDF (64.4 KB)
- Origin - Velkerri 98 N1 Water Bore PDF (63.7 KB)
- Origin - Kalala S Maintenance and Monitoring EMP EP98 - ORI9 PDF (64.2 KB)
- Central Petroleum Limited - NT Drilling PDF (95.4 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (95.7 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (90.9 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (106.5 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (99.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (101.5 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (365.5 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (363.2 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (655.3 KB)
- Imperial Oil and Gas - Seismic PDF (362.7 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (198.3 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (198.1 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program PDF (102.3 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (136.1 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (102.0 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (122.2 KB).
2021-22 quarter 2: October to December 2021
Recordable incident reports received this quarter:
- Central Petroleum Limited - Northern Territory Drilling PDF (95.4 KB)
- Central Petroleum Limited - Dingo and Surprise Oil Field PDF (95.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed well sites WM25 and WM26 PDF (95.9 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (108.4 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, equipment, safety system and gathering line activities PDF (100.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (108.4 KB)
- Origin - Amungee NW-1H EP98 PDF (59.4 KB)
- Origin Beetaloo W-1 EMP PDF (59.6 KB)
- Origin - Kyalla 117 N2 civil construction PDF (59.1 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (59.7 KB)
- Origin - Kyalla 117 Water bore PDF (59.8 KB)
- Origin - Kyalla multiwell PDF (60.3 KB)
- Origin - Velkerri 76 S2 civil construction PDF (59.7 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (60.2 KB)
- Origin - Velkerri 76 S2 Water bore PDF (60.3 KB)
- Origin - Velkerri 98 N1 water bore PDF (59.6 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (515.7 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (444.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (525.4 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program PDF (271.0 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (522.4 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (131.2 KB).
2021-22 quarter 1: July to September 2021
Recordable incident reports received this quarter:
- Central Petroleum Limited - Northern Territory Drilling PDF (59.9 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (80.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (82.2 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (184.4 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (81.9 KB)
- Central Petroleum Limited - Palm Valley PDF (128.2 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (137.4 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (121.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (148.9 KB)
- Santos QNT Pty Ltd - 2019 Civils and Seismic Program PDF (103.5 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (102.8 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (132.9 KB)
- Origin - Amungee NW-1H EP98 PDF (60.3 KB)
- Origin - Kyalla 117 N2 civil construction PDF (62.2 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (62.4 KB)
- Origin - Kyalla 117 Water bore PDF (62.5 KB)
- Origin - Kyalla multiwell PDF (63.0 KB)
- Origin - Velkerri 76 S2 civil construction PDF (61.8 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (62.3 KB)
- Origin - Velkerri 76 S2 Water bore PDF (62.5 KB)
- Origin - Velkerri 98 N1 water bore PDF (63.1 KB).
2020-21 quarter 4: April to June 2021
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (104.4 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (117.5 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (128.5 KB)
- Santos QNT Pty Ltd - 2019 Civils and Seismic Program PDF (99.6 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (99.2 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (132.9 KB)
- Imperial Oil and Gas - Drilling PDF (129.6 KB)
- Imperial Oil and Gas - Hydraulic Fracturing PDF (129.3 KB)
- Imperial Oil and Gas - Seismic PDF (130.0 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (78.6 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (80.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (181.2 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (80.6 KB)
- Central Petroleum Limited - Palm Valley PDF (78.5 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (79.7 KB)
- Origin - Kyalla 117 N2 civil construction PDF (63.8 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (81.8 KB)
- Origin - Kyalla 117 Water bore PDF (64.0 KB)
- Origin - Kyalla multiwell PDF (64.6 KB)
- Origin - Velkerri 76 S2 civil construction PDF (63.4 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (63.9 KB)
- Origin - Velkerri 76 S2 Water bore PDF (64.0 KB)
- Origin - Velkerri 98 N1 water bore PDF (65.2 KB).
2020-21 quarter 3: January to March 2021
Recordable incident reports received this quarter:
- Origin - Velkerri 98 N1 water bore PDF (60.8 KB)
- Origin - Kyalla 117 N2 civil construction PDF (59.3 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (59.6 KB)
- Origin - Kyalla 117 N2 Water bore PDF (59.6 KB)
- Origin - Kyalla multiwell PDF (60.1 KB)
- Origin - Velkerri 76 S2 civil construction PDF (59.4 KB)
- Origin - Velkerri 76 S2 Drilling Stimulation and Well Testing PDF (60.1 KB)
- Origin - Velkerri 76 S2 Water bore PDF (60.1 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (81.3 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (108.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (225.1 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (79.3 KB)
- Central Petroleum Limited - Palm Valley PDF (223.2 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (81.9 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Seismic PDF (132.0 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Seismic Supplementary PDF (131.9 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Drilling Program PDF (213.4 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Drilling Program Supplimentary PDF (164.2 KB)
- Central Petroleum Limited - Mereenie Gas Field PDF (182.2 KB)
- Origin - Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (118.0 KB)
- Santos QNT Pty Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (87.7 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program Velkerri 76 EP76 PDF (66.1 KB)
- Origin - Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (66.0 KB)
- Santos QNT Pty Ltd - McArthur Basin Civil and Seismic program PDF (86.5 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (64.2 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (145.6 KB)
- Central Petroleum Limited - Palm Valley gas field PDF (237.5 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program Environmental Management Plan PDF (91.1 KB)
- Origin- Beetaloo Basin Kyalla, Civil Construction EP117 N2 PDF (63.9 KB)
- Origin - Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (64.1 KB).
2020-21 quarter 2: October to December 2020
Recordable incident reports received this quarter:
- MRN Workovers - Quarterly Recordable Incident Summary PDF (83.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019-20 Hydraulic Fracturing PDF (88.8 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (91.8 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (75.8 KB)
- Central Petroleum Limited - Mereenie Gas Field PDF (243.4 KB)
- Santos QNT PTY Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (89.9 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (88.3 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (66.6 KB)
- Origin - Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (61.8 KB)
- Origin - Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (66.5 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program Velkerri 76 EP76 PDF (62.5 KB)
- Origin - Groundwater Monitoring Bores - Velkerri EP98 PDF (71.2 KB)
- Origin- Beetaloo Basin Kyalla, Civil Construction EP117 N2 PDF (66.2 KB)
- Origin - Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (66.5 KB)
- Imperial Oil and Gas - EP187 2020-21 Drilling Program PDF (174.4 KB)
- Imperial Oil and Gas - 2019 Civils and Seismic program - EP187 PDF (144.9 KB)
- Central Petroleum Limited – Palm Valley Gas Field PDF (219.1 KB)
- Santos QNT Pty Ltd – Tanumbirini Water Bore Monitoring Program PDF (90.5 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (118.7 KB).
2020-21 quarter 1: July to September 2020
Recordable incident reports received this quarter:
- Imperial Oil and Gas- EP187 2020-21 Drilling program PDF (320.1 KB)
- Imperial Oil and Gas – 2019 Civils and Seismic Program PDF (184.2 KB)
- Santos QNT Pty – McArthur Basin 2019-20 Hydraulic Fracturing PDF (92.9 KB)
- Santos QNT Pty – McArthur Basin 2019 Drilling Program PDF (88.4 KB)
- Central Petroleum Limited – Dingo Gas Field and Surprise Oil Field PDF (181.7 KB)
- Origin – Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (89.3 KB)
- Origin – Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (86.2 KB)
- Origin – Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (88.6 KB)
- Origin – Beetaloo Basin groundwater monitoring bore installation program, Velkerri 76 EP76 PDF (88.9 KB)
- Origin – Beetaloo Basin groundwater monitoring bore installation program, Velkerri EP98 PDF (89.3 KB)
- Origin – Beetaloo Basin Kyalla, Civil ConstructionEP117 N2 PDF (62.2 KB)
- Origin – Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (99.4 KB)
- Central Petroleum Limited – Dingo gas field PDF (80.3 KB)
- Central Petroleum Limited – Mereenie gas field PDF (187.5 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (104.6 KB)
- Central Petroleum Limited – Palm Valley gas field PDF (235.1 KB)
- Dukas 1 Gas Well PDF (118.8 KB)
- Santos QNT Pty Ltd – Tanumbirini Water Bore Monitoring Program PDF (90.3 KB)
- Santos QNT Pty Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (86.1 KB).
2019-20 quarter 4: April to June 2020
Recordable incident reports received this quarter:
- Central Petroleum Limited – Surprise oil field PDF (80.3 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019-20 Hydraulic Fracturing PDF (91.2 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019 Drilling Program PDF (88.6 KB)
- Santos QNT Pty – Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (86.1 KB)
- Central Petroleum Limited – Dingo gas field PDF (79.3 KB)
- Central Petroleum Limited – Mereenie gas field PDF (79.2 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (84.3 KB)
- Santos QNT Pty Ltd – Tanumbirini: Water bore monitoring program PDF (86.1 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (114.6 KB)
- Central Petroleum Limited – Palm Valley gas field PDF (219.6 KB).
2019-20 quarter 3: January to March 2020
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (84.4 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (114.9 KB)
- Central Petroleum Limited – Surprise oil field PDF (80.1 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019-20 Hydraulic Fracturing PDF (84.7 KB)
- Central Petroleum Limited – Dingo oil field PDF (77.3 KB)
- Central Petroleum Limited – Mereenie gas field PDF (152.1 KB)
- Santos – McArthur Basin 2019 Drilling Program PDF (85.3 KB).
2019-20 quarter 2: October to December 2019
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd - McArthur Basin 2019-20 Hydraulic Fracturing PDF (88.4 KB)
- Imperial Oil and Gas Pty Ltd – 2D Seismic Work Program EP187 PDF (137.7 KB)
- Santos QNT Pty Ltd – Tanumbirini: Civils and Seismic PDF (92.3 KB)
- Santos QNT Pty Ltd – Tanumbirini: water bore monitoring program PDF (85.9 KB)
- Central Petroleum Limited – Dingo oil field PDF (76.2 KB)
- Central Petroleum Limited – Mereenie gas field PDF (128.8 KB)
- Central Petroleum Limited – Surprise Oil Field PDF (77.2 KB)
- Santos – Dukas 1 Gas Well PDF (121.0 KB)
- Santos – McArthur Basin 2019 Drilling Program PDF (85.5 KB).
2019-20 quarter 1: July to September 2019
Recordable incident reports received this quarter:
- Central Petroleum Mereenie Pty Ltd – Mereenie Gas Field PDF (77.8 KB)
- Central Petroleum Limited – Dingo Gas Field PDF (77.2 KB)
- Central Petroleum – Palm Valley Gas Field PDF (136.2 KB)
- Santos QNT Pty Ltd – Civil and Seismic program – McArthur Basin EP161 PDF (93.5 KB)
- Santos – bore water monitoring: Tanumbirini North PDF (91.4 KB)
- Santos – McArthur Basin 2019 drilling program PDF (89.5 KB).
2018-19 quarter 4: April to June 2019
Recordable incident reports received this quarter:
- Central Petroleum – Mereenie gas field PDF (183.4 KB)
- Central Petroleum – Dingo gas field PDF (77.5 KB)
- Central Petroleum – Palm Valley gas field PDF (173.7 KB)
- Santos – Dukas 1 Conventional gas well PDF (27.2 KB)
- Origin – Kyalla 117 water monitoring bore PDF (141.1 KB)
- Santos – water bore monitoring: Tanumbirini South, Inacumba North and Inacumba South PDF (86.6 KB).
2018-19 quarter 3: January to March 2019
Recordable incident reports received this quarter:
2018-19 quarter 2: October to December 2018
Recordable incident reports received this quarter:
Last updated: 22 April 2022
Give feedback about this page.
Share this page:
URL copied!